Goods Movement against Production Order in SAP PP: MIGO

 There are two types of goods movement against production order which impacts the inventory of the material. These movements are done through movement types in SAP.

  • Goods Receipt (GR) against Order is executed with movement type 101 which is done when we produce the material. After goods receipt, the system increases the stock of the material at the relevant storage location.
  • Goods Issue (GI) against Order is executed with movement type 261 which is done whenever we consume the component materials to produce some other material. After goods issue, the system decreases the inventory of the components at the relevant storage location.


How to Create Goods receipt (GR) against Order

Step 1) From SAP Easy access screen open transaction MIGO

  1. Select Goods Receipt as you are going to do goods receipt.
  1. Select Order as you are doing goods receipt against production order.
  1. Enter your Production order number.

Goods Movement against Production Order in SAP PP: MIGO


After filling in all the fields, click Goods Movement against Production Order in SAP PP: MIGO or press Enter to go to the next screen.

Step 2) In this Screen

  1. Check movement type “101” which is relevant for GR against Order.
  1. If the material is subject to quality inspection, then you will see the stock type as “quality inspection”.
  1. If the material is handled in batches, then enter the batch number in which inventory will be updated.

Goods Movement against Production Order in SAP PP: MIGO


Step 3) In the same screen,

  1. Enter the date of manufacture, i.e., the date when the material was produced.
  1. Check flag of “Item Ok “.
  1. Click “check” button on top and you will see the message at the bottom of the screen.

Goods Movement against Production Order in SAP PP: MIGO


Click Goods Movement against Production Order in SAP PP: MIGO to save the document. The system will show a message like Goods Movement against Production Order in SAP PP: MIGO.


How to create goods issue (GI) against order

Step 1) From SAP Easy access screen open transaction MIGO

  1. Select “Goods Issue” in the first box.
  1. Select “Order” in the second box which means we will do GI against Order.
  1. Enter the production order.

Goods Movement against Production Order in SAP PP: MIGO


After filling in all the fields, clickGoods Movement against Production Order in SAP PP: MIGO to go to the next screen

Step 2) In this screen,

  1. You can see the list of components automatically fetched from the Order along with required quantity. You can change the quantity as per the actual consumption.

Goods Movement against Production Order in SAP PP: MIGO


Step 3)In the same screen,

  1. Check flag of “Item Ok “.
  1. Click “check” button on top and you will see the message at the bottom of the screen.
  1. You can see the green color status which indicates that document is OK for posting.

Goods Movement against Production Order in SAP PP: MIGO


Click Goods Movement against Production Order in SAP PP: MIGO to save the document. The system will show a message likeGoods Movement against Production Order in SAP PP: MIGO


Troubleshooting

  • For manual goods issue, the material master should not have any back flush indicator which means we will do manual goods issue rather automatic goods issue during confirmation.
  • For manual goods receipt, routing operation data should have control key without auto GR flag, which means we will do manual goods receipt rather automatic goods receipt during confirmation.

Comments

Popular posts from this blog

How to Create Production version in SAP PP C223

  The production version is the link between a product BOM (Bill of Material) and the process Routing. It determines which alternative BOM is used together with which routing to produce a material or plan a material. There may be different production versions based on the lot sizes and validity dates. For example, there may be different versions if you want to produce 1 – 100 liter of paint than 100 – 1000 liter of paint, as such the different composition of BOM may be required in both cases. It comprises of the following data: The assignment of routings to the production version The assignment of the alternative BOM to the production version Production versions are used in material requirements planning (MRP), production order creation, and product costing to select the most suitable routing and the corresponding bill of material. In order to create production version, perform the following steps- Step 1)  From SAP Easy access screen open transaction  C223 Enter Plant Code. Enter pare

Bill of Material (BoM) in SAP PP: Create, Change, Display

  What is Bill of Material (BOM) and its role? A bill of material is a complete, formally structured list of the components that make up a product or assembly. The list comprises of the material number of each component, together with the quantity and unit of measure. BOM can be single level and multi-level. For example, finished material would contain semi-finished materials as components which in turn would contain raw materials as components in next level. There can be different alternative BOMs for a product depending upon the lot sizes, validity dates, and different production methods. BOM is used in production planning for semi-finished and purchase planning for raw materials. BOM’s are also used in standard cost calculation for finished Product by rolling up the cost from raw to semi-finish and then to finished Product. Material BOM can be made for material in PP module and equipment BOM are used in Plant Maintenance module. How to create BOM Step 1)  From SAP Easy access screen

Production Order in SAP: CO01, MD16, CO02, CO15

  A production order defines which material is to be processed, at which location, and at what time and how much quantity is required. It also defines which components and sequence of operations are to be used and how the order costs are to be settled. Planned orders are results of running MRP. Shortages of materials that are set to internal procurement will create planned orders, which can be converted into production orders. Production orders are “hard copies”; they cannot be adjusted by an MRP run anymore. BOM and routing data of the materials are copied into the production order which determines the list of components and operational data in the order. Planned Costs also gets updated in the production order via component price and routing activity price. You can run an availability check on production orders which determines any missing components in the order so that you can bring that missing component for the order execution at shop floor. You can print the production order for

Introduction to SAP PP (Production Planning)

  What is Production Planning? Production Planning is the process of aligning demand with manufacturing capacity to create production and procurement schedules for finished products and component materials. SAP PP is an important module of SAP. It tracks and makes a record of the manufacturing process flows, for example, the planned and actual costs. Also, goods movements from the conversion of raw material to semi-finished goods. It is fully integrated with the other SAP modules: SD, MM, QM, FICO & PM. Organization Structure in SAP PP In any live Production Planning module, locations of manufacturing plants and storage within the plants, should be available in the system. Importance of Plant and storage locations in Production Planning- All Production master data is created at Plant level. Planning activities are also performed at Plant level. Production Confirmation process and related goods movement occur at plant and storage location level. Master Data in SAP PP Master data is

What is SAP? Meaning of SAP ERP Software

  What is SAP? SAP  stands for Systems Applications and Products in Data Processing. SAP, by definition, is also the name of the ERP (Enterprise Resource Planning) software as well as the name of the company. SAP Software is a European multinational, founded in 1972 by Wellenreuther, Hopp, Hector, Plattner, and Tschira. They develop software solutions for managing business operations and customer relationships. SAP system consists of a number of fully integrated modules, which covers virtually every aspect of business management. SAP is #1 in the ERP market. As of 2010, SAP has more than 140,000 installations worldwide, over 25 industry-specific business solutions and more than 75,000 customers in 120 countries. Other Competitive products of SAP Software in the market are Oracle, Microsoft Dynamics, etc. What is SAP ERP? Why is it Required? The very fundamental question for any beginners is why Enterprise Resource Planning also called ERP, is required? To answer this, let’s examine thi

SAP PP Reports Tutorial: COOIS, MB52, CS15, CS12

  There are many reports available in SAP pertaining to Master Data, Production Orders and Goods Movement against orders. It helps users to view the overall situation of the plant with ease Through PP reports, you can view Production and Consumption data about the material for the specific time period. Current Plant stock can also be displayed real time You can also see target order quantity to be executed and track the orders through various order status via standard SAP reports How to display order information systems This order info system displays the list of orders along with the quantity, dates, and their status. You can also see the goods movement on the orders. This gives view for the shop floor person to plan and execute the orders which are on priority, and you can see the actual delivered quantity against the plan. Step 1)  From SAP Easy access screen open transaction COOIS Select the option “Order Headers” in the List field Flag production orders checkbox Enter your manufac

SAP PP Capacity Planning: CM01, CM21

  The main function of capacity planning is to check the load at Work Center and do the capacity leveling i.e. balance the load at Work Center. It helps to calculate the production capacity based on the requirement of the product against the available capacity of the work center. MRP works with infinite capacity and creates planned orders at the Work Center at the same time since it assumes that Work Center is available all the time. So, it creates planned orders on the same date based on the requirements despite capacity shortages. You can execute those orders on that Work Center in the system which is not practically feasible in the shop floor. The main objective of the capacity leveling includes leveling overloads at Work Center and to achieve optimum utilization of Work Centers. MRP generated planned orders are converted to production orders which determine which Work Center is to be used, and accordingly the capacity requirements are generated on that Work Center. Capacity levelin