Bill of Material (BoM) in SAP PP: Create, Change, Display

 

What is Bill of Material (BOM) and its role?

A bill of material is a complete, formally structured list of the components that make up a product or assembly. The list comprises of the material number of each component, together with the quantity and unit of measure.

  • BOM can be single level and multi-level. For example, finished material would contain semi-finished materials as components which in turn would contain raw materials as components in next level.
  • There can be different alternative BOMs for a product depending upon the lot sizes, validity dates, and different production methods.
  • BOM is used in production planning for semi-finished and purchase planning for raw materials.
  • BOM’s are also used in standard cost calculation for finished Product by rolling up the cost from raw to semi-finish and then to finished Product.
  • Material BOM can be made for material in PP module and equipment BOM are used in Plant Maintenance module.

How to create BOM

Step 1) From SAP Easy access screen open transaction CS01

  1. Enter parent material for which BOM needs to be created.
  1. Enter Plant Code.
  1. Enter BOM usage = “1” which is used for Creating Production BOM
  1. Enter the valid from the date which means that BOM would be valid from that date.

Bill of Material (BoM) in SAP PP: Create, Change, Display


After filling in all the fields, click Bill of Material (BoM) in SAP PP: Create, Change, Display or press Enter to go to the next screen.


Step 2) In Next Screen

  1. Enter Item Category as “L” which is used for stock item and could be default also.
  1. Enter Component material code in Component Field.
  1. Enter Component quantity as shown below.
  1. Some information such as description and a basic unit measure of the component will be brought out by the system automatically after clicking Bill of Material (BoM) in SAP PP: Create, Change, Display or pressing enter from the keyboard.

Bill of Material (BoM) in SAP PP: Create, Change, Display



Useful Notes:

To drill further down through the BOM for one of these components, double click on the Bill of Material (BoM) in SAP PP: Create, Change, Display within the Assembly column. If the box is not ticked, then the component has no further BOM.


Step 3) In this screen,

  1. Click on this icon Bill of Material (BoM) in SAP PP: Create, Change, Display to see the BOM header, the system will then show the BOM header screen in the next step:

Bill of Material (BoM) in SAP PP: Create, Change, Display


Step 4) In the BOM header view,

  1. Fill the base quantity of parent material. If this is 1 EA (each), then the component quantity will describe how much is needed to produce 1 item.
  1. Click Bill of Material (BoM) in SAP PP: Create, Change, Display to save the new BOM after check, the system will show message Bill of Material (BoM) in SAP PP: Create, Change, Display at the lower left corner.


Bill of Material (BoM) in SAP PP: Create, Change, Display


Now, in next step we are going to see, how to change BOM?


How to Change BOM

We would change the BOM if there is any change in the list of components or any component quantity which is used to manufacture the final product.

Step 1) From SAP Easy access screen open transaction CS02.

  1. Enter parent material for which BOM needs to be changed.
  1. Enter Plant Code.
  1. Enter BOM usage = “1” which is used for changing Production BOM.
  1. Enter the valid from date which means that BOM would be valid from that date.

Bill of Material (BoM) in SAP PP: Create, Change, Display


Step 2) After filling in all the fields, click Bill of Material (BoM) in SAP PP: Create, Change, Display to go to the next screen.

  1. Change the component code or quantity.
  1. After finishing all modifications, click Bill of Material (BoM) in SAP PP: Create, Change, Display to save BOM. The system will show a message like Bill of Material (BoM) in SAP PP: Create, Change, Display changed at the lower left corner.

Bill of Material (BoM) in SAP PP: Create, Change, Display


How to display BOM

Step 1) From SAP Easy access screen open transaction CS03

  1. Enter parent material for which BOM needs to be displayed.
  1. Enter Plant Code.
  1. Enter BOM usage = “1” which is used for changing Production BOM.
  1. Enter the valid from date which means that BOM would be valid from that date.

Bill of Material (BoM) in SAP PP: Create, Change, Display


Click Bill of Material (BoM) in SAP PP: Create, Change, Display to go to the next screen.

Step 2) In this screen, a list of components along with quantity would be displayed.

  1. Click Bill of Material (BoM) in SAP PP: Create, Change, Display icon to see the BOM header.

Bill of Material (BoM) in SAP PP: Create, Change, Display


In next step, you will see BOM header.


Step 3) In this step, BOM header would be displayed.

  1. Display base quantity of product.

Bill of Material (BoM) in SAP PP: Create, Change, Display


Troubleshooting

  • There might be the case wherein component material does not exist. For this, you need to create the material master for the component material before creating BOM.
  • Some users try to create the BOM again for the same Product, system gives warning message regarding “Alternative BOM2 is being created” and they tend to ignore the warning message and move forward and hence end up in creating similar alternative BOM 2 for same product. This unnecessary creates duplicate data.

Comments

Popular posts from this blog

How to Create Production version in SAP PP C223

  The production version is the link between a product BOM (Bill of Material) and the process Routing. It determines which alternative BOM is used together with which routing to produce a material or plan a material. There may be different production versions based on the lot sizes and validity dates. For example, there may be different versions if you want to produce 1 – 100 liter of paint than 100 – 1000 liter of paint, as such the different composition of BOM may be required in both cases. It comprises of the following data: The assignment of routings to the production version The assignment of the alternative BOM to the production version Production versions are used in material requirements planning (MRP), production order creation, and product costing to select the most suitable routing and the corresponding bill of material. In order to create production version, perform the following steps- Step 1)  From SAP Easy access screen open transaction  C223 Enter Plant Code. Enter pare

Production Order in SAP: CO01, MD16, CO02, CO15

  A production order defines which material is to be processed, at which location, and at what time and how much quantity is required. It also defines which components and sequence of operations are to be used and how the order costs are to be settled. Planned orders are results of running MRP. Shortages of materials that are set to internal procurement will create planned orders, which can be converted into production orders. Production orders are “hard copies”; they cannot be adjusted by an MRP run anymore. BOM and routing data of the materials are copied into the production order which determines the list of components and operational data in the order. Planned Costs also gets updated in the production order via component price and routing activity price. You can run an availability check on production orders which determines any missing components in the order so that you can bring that missing component for the order execution at shop floor. You can print the production order for

Introduction to SAP PP (Production Planning)

  What is Production Planning? Production Planning is the process of aligning demand with manufacturing capacity to create production and procurement schedules for finished products and component materials. SAP PP is an important module of SAP. It tracks and makes a record of the manufacturing process flows, for example, the planned and actual costs. Also, goods movements from the conversion of raw material to semi-finished goods. It is fully integrated with the other SAP modules: SD, MM, QM, FICO & PM. Organization Structure in SAP PP In any live Production Planning module, locations of manufacturing plants and storage within the plants, should be available in the system. Importance of Plant and storage locations in Production Planning- All Production master data is created at Plant level. Planning activities are also performed at Plant level. Production Confirmation process and related goods movement occur at plant and storage location level. Master Data in SAP PP Master data is

What is SAP? Meaning of SAP ERP Software

  What is SAP? SAP  stands for Systems Applications and Products in Data Processing. SAP, by definition, is also the name of the ERP (Enterprise Resource Planning) software as well as the name of the company. SAP Software is a European multinational, founded in 1972 by Wellenreuther, Hopp, Hector, Plattner, and Tschira. They develop software solutions for managing business operations and customer relationships. SAP system consists of a number of fully integrated modules, which covers virtually every aspect of business management. SAP is #1 in the ERP market. As of 2010, SAP has more than 140,000 installations worldwide, over 25 industry-specific business solutions and more than 75,000 customers in 120 countries. Other Competitive products of SAP Software in the market are Oracle, Microsoft Dynamics, etc. What is SAP ERP? Why is it Required? The very fundamental question for any beginners is why Enterprise Resource Planning also called ERP, is required? To answer this, let’s examine thi

Long Term Planning (LTP) in SAP PP: MS31, MS04, MD61

  SAP PP Long Term Planning (LTP) Long Term Planning (LTP) in SAP PP is used to simulate the future demand and supply situation in all BOM levels. The main function is to check the capacity situation, material requirement and vendor ability to provide the material in desired time. This is not an actual run but a simulative run where actual planning situation is not being affected, and we can see the capacity situation of the work centers well ahead in time. If such information is available in advance, then we can decide at an early date whether additional machines will be required to cope with capacity bottlenecks. LTP (Long Term Planning) is nothing but MRP run in simulation version to simulate the production plan for the future. It is possible to transfer the plan from simulative version to operative version “00”(actual planning) if through simulation it is found that all capacity and requirement can be fulfilled. The purchasing department can also utilize the outcome of long-term pl

SAP PP Reports Tutorial: COOIS, MB52, CS15, CS12

  There are many reports available in SAP pertaining to Master Data, Production Orders and Goods Movement against orders. It helps users to view the overall situation of the plant with ease Through PP reports, you can view Production and Consumption data about the material for the specific time period. Current Plant stock can also be displayed real time You can also see target order quantity to be executed and track the orders through various order status via standard SAP reports How to display order information systems This order info system displays the list of orders along with the quantity, dates, and their status. You can also see the goods movement on the orders. This gives view for the shop floor person to plan and execute the orders which are on priority, and you can see the actual delivered quantity against the plan. Step 1)  From SAP Easy access screen open transaction COOIS Select the option “Order Headers” in the List field Flag production orders checkbox Enter your manufac

SAP Demand Management Tutorial: MD61, MD62, MD04, MD74, MD75

  What is Planned Independent Requirement (PIR)? Planned Independent Requirements (PIR) are used to perform Demand Management functions. A Planned Independent Requirement contains one planned quantity and one date for a material, or one planned quantity split over time according to dates. PIR version “00” has an active indicator, which specifies that requirements would be considered in Material Requirement Planning (MRP). If you want to maintain a number of versions of planned independent requirements, but do not want to include all versions in the material requirement planning run, you can set some versions to active and others to inactive, which could be used for simulations in Long term Planning. PIR’s are associated with requirement type which is driven from planning strategies in the material master, which determines methods of planning – Make to Stock or Make to Order. PIR’s are displayed in stock requirement list so that Planner can see and plan the production based on it. PIR’s